EOI – Multinational – Individual Consultants Forming the Project Coordination Team – Standard Gauge Railway (SGR) Project Phase II
The scope of works under this project includes the design and construction of approximately 240 route-kilometers of mainline railway and 60 kilometers of sidings and passing loops. The electrified Standard Gauge Railway (SGR) line will extend from Uvinza (Tanzania), branching off from the Tabora – Kigoma SGR line, crossing the Malagarasi River at the international border, and terminating at Musongati (Burundi).