Kenya Secures KSh 300 Million for Mau Summit-Kisumu-Malaba Road Feasibility Study

Road transport in Kenya is entering a new planning phase on the Mau Summit-Kisumu-Malaba corridor. The Kenyan government has secured KSh 300 million from the Asian Infrastructure Investment Bank (AIIB) to finance the feasibility study for the project.
Feasibility Study Prepares Next Stage of Highway Project
Kenyan President William Ruto announced the funding on September 14, 2026, in Kisumu. The study will define the technical and financial requirements for upgrading the Mau Summit-Kisumu-Malaba road, a key section of the Northern Corridor.
The project covers a planned 243-kilometre highway designed to upgrade the existing road into a four-lane, controlled-access toll highway. Implementation is being prepared under a public-private partnership (PPP) structure.
An AIIB-supported pre-feasibility study was completed in May 2026. The full feasibility study will examine traffic forecasts, engineering designs, environmental and social impacts, climate resilience and the proposed tolling structure.
Northern Corridor: Direct Impact on Freight Flows to Uganda
The Mau Summit-Kisumu-Malaba route is an important freight connection between western Kenya and Uganda. It forms part of the wider Northern Corridor, linking the Port of Mombasa with landlocked markets in East Africa.
The road carries significant truck traffic, including cargo moving towards Uganda and other regional destinations. Increasing road capacity could therefore affect transit times, truck operating costs and traffic fluidity.
For logistics operators, however, the execution phase will be critical. Maintaining freight flows during construction will be necessary to avoid additional delays along one of the region’s key trade routes.
Why the Mau Summit-Kisumu-Malaba Road Matters
- Capacity: Expanding the road to four lanes would increase capacity on a route already handling substantial freight traffic.
- Regional transit: Improved connectivity would strengthen links between Mombasa, western Kenya and Uganda.
- Infrastructure investment: The feasibility study will provide the technical and financial basis for moving the project towards a PPP structure.
Road and Rail Projects Could Reinforce the Northern Corridor
The road project is being developed alongside plans to extend Kenya’s Standard Gauge Railway (SGR) to Kisumu and Malaba.
Kenya is also discussing with Uganda how the railway could eventually be connected beyond Uganda towards the Democratic Republic of Congo (DRC).
If implemented, the combination of road and rail infrastructure could increase the Northern Corridor’s multimodal capacity. It could also provide additional options for moving cargo from the Port of Mombasa towards Uganda and other landlocked markets in East and Central Africa.
The AIIB has also been engaged in discussions over other Kenyan infrastructure projects, including the Rironi-Mau Summit road, SGR extensions and transport infrastructure around Nairobi.
The KSh 300 million funding for the Mau Summit-Kisumu-Malaba road represents a preparatory step towards upgrading a strategic section of Kenya’s Northern Corridor. The feasibility study will determine the technical, financial and operational conditions required before the highway can move towards implementation.

