AFRICAN AIRLINES’ PERFORMANCE UPDATES BY AFRAA – JANUARY 2022

The number of people infected by the Omicron Covid variant continues to increase. This has unfortunately resulted in some countries putting in place panic measures against international travel.  Globally, the number of cases has reached 350 million and 10.7 million in Africa. Stringent travel advisories, insistence on full vaccination before travel, forceful vaccination at ports of arrival, repatriation of passengers not meeting entry travel requirements and quarantine of passengers at their own costs are some of the unorthodox measures being enforced by some governments.

In fact, in one African country airlines are fined as much as US$3,500 per passenger for landing passengers that have not taken their second vaccination or failed to complete online health declaration forms.

As a result of these uncoordinated measures, air passenger traffic from …

Click on the following link to read more : https://africaaero.org/en/news/african-airlines-performance-updates-by-afraa-january-2022/

RELATED ARTICLES

Launch of the report “Pirates and Oil Theft in the Niger Delta: an analysis of the connection between piracy and oil bunkering”

The CRIMSON project is pleased to announce the “Pirates and Oil Theft in the Niger Delta: an analysis of the connection between piracy and oil bunkering” report, launched on 1st December 2022 at the G7++ Friends of the Gulf of Guinea (FoGG) in Abidjan, Cote d’Ivoire. The study was coordinated by Thomas Kieler, EU Delegation […]

Read More

Senegal: African Development Bank to invest over €166 million in construction of highway to open up the country’s north

The construction of a highway between Dakar and Saint Louis will open up Senegal’s northern regions, considered the country’s rice granary and an area with high mining potential. The Board of Directors of the African Development Bank, has approved a loan of  €166.36 million to Senegal for construction of the Dakar-Tivaouane-Saint Louis highway, which will […]

Read More

Uganda : Rehabilitation of Bulindo-Nsasa-Namugongo Roads

Residents of Bulindo, Nsasa and Namugongo in Kira Municipality relieved as rehabilitation works for the 4.56 Km road that links them commences. The 4.56 Km stretch has been characterized by dust during the dry season and excess mad and gullies during the rainy season. The residents are therefore greatly relieved at the prospect of upgrading […]

Read More