SOGESTER TERMINAL LUANDA GEARS UP TO MEET FUTURE CUSTOMER NEEDS

(APM Terminals) New terminal equipment recently purchased increases the reliability and productivity of terminal operations, enabling better service to customers. New online solutions facilitate transactions, offering customers a full range of interactions from behind their desk.

Sogester (Sociedade Gestora de Terminais, S.A.) container terminal in Luanda, Angola (operating since 2007) is a joint venture between APM Terminals (51%) and the Gestor de Fundos of Angola. In December 2021, the terminal significantly upgraded its equipment with the arrival of 2 new Liebherr mobile harbour cranes (MHC 800 series), the largest terminal cranes available in the region, able to reach 23 rows of containers, compared to 15 or … read more : https://maritimafrica.com/en/sogester-terminal-luanda-gears-up-to-meet-future-customer-needs/

RELATED ARTICLES

Launch of the report “Pirates and Oil Theft in the Niger Delta: an analysis of the connection between piracy and oil bunkering”

The CRIMSON project is pleased to announce the “Pirates and Oil Theft in the Niger Delta: an analysis of the connection between piracy and oil bunkering” report, launched on 1st December 2022 at the G7++ Friends of the Gulf of Guinea (FoGG) in Abidjan, Cote d’Ivoire. The study was coordinated by Thomas Kieler, EU Delegation […]

Read More

Senegal: African Development Bank to invest over €166 million in construction of highway to open up the country’s north

The construction of a highway between Dakar and Saint Louis will open up Senegal’s northern regions, considered the country’s rice granary and an area with high mining potential. The Board of Directors of the African Development Bank, has approved a loan of  €166.36 million to Senegal for construction of the Dakar-Tivaouane-Saint Louis highway, which will […]

Read More

Uganda : Rehabilitation of Bulindo-Nsasa-Namugongo Roads

Residents of Bulindo, Nsasa and Namugongo in Kira Municipality relieved as rehabilitation works for the 4.56 Km road that links them commences. The 4.56 Km stretch has been characterized by dust during the dry season and excess mad and gullies during the rainy season. The residents are therefore greatly relieved at the prospect of upgrading […]

Read More